Monitor Your Runs provides a log of every execution of a deployed automation — its timing, status, duration, and a step-by-step breakdown for debugging. Use it after deployment to confirm the automation is running correctly and to diagnose failures.
Overview
The Runs tab, under the Run History heading, is where you go after deployment to confirm the automation is running correctly and to diagnose failures. Logged runs appear here. The available step inputs and outputs depend on the logging depth: enable Step Details and Full Trace to capture the corresponding details for future runs, so you can identify exactly which node failed, what input it received, and what error it returned — without re-running the automation.
Note: Runs appear in Run History when run logging is enabled and the automation has been deployed and executed at least once. If logging is disabled, enable logging to save details for future runs.


Run History
The number next to Run History is the total number of runs in the selected date range. Each row in the run list is one run and shows:
Column | Description |
|---|---|
Executed On | The date and time the run was triggered |
Status | The final state of the run (see status filters below) |
Duration | Total wall-clock time from trigger to completion |
Click any row to open the Run Preview for that execution.
Filter
Filter the run list by status using AND/OR operators to isolate the runs you want to investigate:
Status | Meaning |
|---|---|
Successful | All nodes completed without error |
Failed | At least one node errored and the automation did not complete |
Completed | The run finished, but one or more steps failed. An N errors link shows how many. |
Cancelled | The run was manually cancelled before completion |
In Progress | The run is currently executing |
Waiting | The run is waiting on a delay or an external response |
Date Range
Use the date range picker to narrow the run list to a specific window. This is useful when investigating an incident that occurred on a specific date, or when reviewing the performance of an automation over the past week.
Run Preview
Clicking a run opens a canvas view of that execution:
Successful run — Nodes that executed are shown with a green highlight and a checkmark; nodes that were not reached (skipped branches) are shown in gray.
Failed run — The node where execution stopped is highlighted in red with the error message and HTTP status code displayed inline. Select the node to read the full error details.
Cancel a run — For a run that is Waiting or in progress, select Cancel from the run row or the run header. You can also select multiple runs and use Cancel Runs; only still-running runs are affected.
Notes
Monitoring is the production phase of the automation lifecycle — it tells you whether your deployed automation is doing what you intended. To monitor effectively:
Filter to "Failed" runs first after any deployment to catch immediate issues before they accumulate.
Use the date range filter when responding to an incident report — narrow to the time window the user reported the issue in rather than scrolling through all runs.
Click through to the failed node's Errors tab for the exact HTTP response — the status code and message usually point directly to the fix.
Set up a monitoring automation that queries run history and alerts on an elevated failure rate, rather than checking manually.
A clean monitor view — mostly Successful with occasional transient failures — is the confirmation that an automation is production-ready.